Written by the NIS2Compass Team ·
Municipal utilities and communal energy providers fall under Annex 1 BSIG as the Energy sector. The NIS2 obligation applies from 50 employees or more than €10M in both annual revenue and balance sheet total. For operating energy networks and plants, the BNetzA IT security catalog applies (previously based on §11 (1a) EnWG, since 6 December 2025 §§5c–5e EnWG), alongside ISO 27019. NIS2Compass structures the implementation path for IT teams of 3-8 people, without €700/day consultants.
Sector
Annex 1 BSIG, Energy sector: electricity (§3 EnWG), gas, district heating. Virtually every municipal utility organisation.
Size
50+ employees or more than €10M in both annual revenue and balance sheet total (§28 (2) BSIG). Special rules apply to municipal in-house enterprises (Eigenbetriebe) when determining size (§28 (4) BSIG). Network operators are subject to the IT security catalog under §5c EnWG regardless of size.
Additional regulation
BNetzA IT security catalog under §§5c–5e EnWG (for network and plant operation instead of §§30, 32, 38 BSIG, see §28 (5) BSIG), ISO 27019, B3S water/wastewater. KRITIS applies only from 3,700 GWh/year.
Control systems, SCADA and meter infrastructure were historically separated. §30 No. 5 requires integrated network segmentation.
EnWG security catalog, ISO 27019 and NIS2 run in parallel. Mapping these requirements is barely manageable for 3-person IT teams.
§38 BSIG and §5e EnWG oblige the management body to undergo training. In communal utilities, mayors and council members often lack IT backgrounds.
A municipal utility with 120 employees and 5 people in the IT team faces EnWG evidence plus NIS2 implementation: two regulations, no external consulting in the budget. NIS2Compass delivers the structured 8-chapter guide with 124 steps. Each step shows what the BSIG requires and links to the matching template from the library. Articles explain the statutes in SME-friendly language. Structured, instead of wading through 500 BSIG pages.
NIS2 Guide
8 chapters, 124 substeps, each with a template
45+ Templates
Policies, registers, notification forms
Knowledge Hub
40+ expert articles on §30 BSIG and implementation
For the operation of energy supply networks and energy plants subject to §§5c–5e EnWG, §§30, 31, 32, 35, 36, 38 and 39 BSIG do not apply (§28 (5) BSIG). They are replaced by the BNetzA IT security catalog (§5c EnWG), documentation and incident notification (§5d EnWG) and the duties of the management body (§5e EnWG). Registration with the BSI under §33 BSIG still applies. If your utility runs further lines of business listed in Annex 1 or 2 BSIG, such as drinking water or wastewater, the BSIG applies to those activities. Document in writing which systems fall under which regime, especially where several lines of business share IT.
The central technical obligation for municipal utilities. The historical separation between office IT and OT control systems is not sufficient: NIS2 requires documented zones, default-deny policies and firewall rule sets for SCADA and meter networks. Note: under §28 (5) BSIG, the operation of energy supply networks and energy plants is governed by the BNetzA IT security catalog (§5c EnWG) instead of §30 BSIG. For other lines of business such as water or wastewater, §30 BSIG remains decisive.
24-hour early warning, 72-hour full notification, 1-month final report to the BSI. On order of the BSI, §35 BSIG may additionally require you to inform the recipients of your services. For network and plant operation, §5d (3) EnWG applies instead: same deadlines, notification to the BSI reporting office.
Management and supervisory boards must approve risk management measures, monitor implementation and participate in training. Personal liability for failure to supervise. For network and plant operation, §5e EnWG sets out the implementation, monitoring and training duties of the management body.
Network and plant operators document how they comply with the IT security catalog (§5d (1) EnWG). Network operators, and plant operators that are essential entities, submit this documentation to the BNetzA without undue delay after it is prepared. The BNetzA can demand a remediation plan, set deadlines for fixing security deficiencies and enter business and operating premises for inspection. Network operators that are neither important nor essential entities also had to register with the BSI by 6 March 2026 (§5d (4) EnWG).
Under §5c (1) sentence 2 EnWG, adequate protection must already be ensured when procuring plant equipment and services. For municipal utilities this means: security requirements belong in tenders, specifications and framework contracts for control and telecontrol systems and for maintenance service providers. Because such systems usually stay in operation for many years, gaps in procurement have long-lasting effects. Review ongoing tenders and upcoming contract renewals first.
If your utility operates a critical facility outside the energy sector, for example in drinking water supply, you demonstrate the measures for that facility to the BSI every three years through security audits, inspections or certifications (§39 (1) BSIG). The BSI sets the first date. Under §28 (5) BSIG, §39 BSIG does not apply to network and plant operation in the energy sector. There, the BNetzA reviews compliance on the basis of §5d EnWG.
| Kriterium | NIS2Compass | Klassische Beratung | ISMS-Tool | Selbstumsetzung |
|---|---|---|---|---|
| Monthly cost | €29 | €700-1,600/day | €200-2,000/month | €0 |
| German language | yes | yes | partly English | - |
| EnWG / ISO 27019 context | implicitly covered | depends on consultant | generic | build yourself |
| Templates without extra cost | yes (45+) | project-specific | usually extra | no |
| For 3-8-person IT teams | yes | too expensive | too complex | capacity-challenged |
| Ready to use | 10 minutes | weeks | days + setup | months |
8 chapters, 124 steps, 45+ templates, ready to use in 10 minutes.